Opening up the ground floor
Where the structure allows it, walls between kitchen, dining and living can come down — removed with structural support, engineer sign-off and the relevant authority approvals in place before work begins.
Townhouse interiors and renovations across Dubai and Abu Dhabi — open-plan living, storage built into every floor and family layouts that work from the front door to the roof terrace.
★★★★★ 4.8 out of 5 from 62 Google reviews Read our client reviews
A townhouse is lived vertically. The stair is the hallway, and every floor has to earn the climb.
Where the structure allows it, walls between kitchen, dining and living can come down — removed with structural support, engineer sign-off and the relevant authority approvals in place before work begins.
In a townhouse the staircase is seen from every floor. Its lighting, its finishes and the walls around it are designed as one piece rather than left as circulation.
Under-stair storage, wardrobes, dressing rooms, pantries and utility, made to the millimetre for each opening so storage disappears into the wall.
Bedrooms, play space and somewhere quiet to work, planned around how the household actually lives — when the house is full and when it is empty. A detached home is planned the same way: see villa interior design.
Roof terraces and external works can be designed and built as part of the same programme.
Ambient, task and accent lighting on separate circuits with dimming, with colour temperature kept consistent from floor to floor.
Bedrooms, play space and a quiet room to work: the layout is settled first, in 3D, and the joinery is then made in our workshop to fit it.
Walk through every floor before anything is committed.
Under-stair cupboards and wardrobes cut for the space they occupy.
Civil works, MEP alterations, joinery and finishing under one site team.
A townhouse shares at least one wall with a neighbour, and often a roofline and a streetscape. That shapes what can change. The party wall carries structure and sound, so cutting into it for a niche, a cable route or a recessed unit needs care and sometimes an engineer's view. Noise also travels through it during the works, and communities set working hours for contractors.
Community rules govern the outside as well. Emaar's community FAQs, for example, say any alteration needs its approval through an NOC, pergolas included, and that external changes altering the look of the homes are not permitted. A roof terrace, a garden structure or new windows need the community's answer before they are designed. Townhouse interior design consultants should raise these in the first meeting.
A townhouse is lived vertically, so its services run vertically too. Bathrooms tend to stack, and the drainage, water and air-conditioning that serve them pass through every floor. Moving a bathroom on the first floor can mean opening the ceiling of the room below. Settle the layout for all floors together before work starts on any of them.
Plan the order of work around the stair. Every delivery and every trade passes through it, so it should be protected throughout and finished last. Finishing upper floors before the ground floor keeps materials and debris away from completed rooms. If you are living in the house, agree which floor stays usable at each stage, and where you will cook while the kitchen is out of use.
Townhouse plans are narrow, and storage is usually the first thing they run short of. The places to look are the ones a standard wardrobe cannot use: the triangle under the stair, landing walls, the space beside a column, the depth behind a bedroom door. Each is an awkward shape, and each suits joinery made to the opening.
Begin with a list of what needs a home on each floor: coats and shoes by the front door, cleaning equipment near the kitchen, linen near the bedrooms, luggage and seasonal items somewhere out of the way. Then give each item a place on the floor where it is used. We set out every piece against the opening it will occupy and make it at our factory in Al Quoz.
Ask a townhouse interior designer for drawings of every floor, the stair included, and for a 3D walkthrough that follows the route from the front door to the roof terrace. A design that treats each floor as a separate project tends to leave the stair as leftover space and the storage short.
Ask any townhouse interior design company who builds the design as well. Opening a ground floor needs structural work, engineer sign-off and approvals; under-stair joinery needs exact measurement; a roof terrace brings waterproofing and external works. With civil works, MEP alterations, joinery and finishing under one site team, those pieces are coordinated by one project manager. Our six-stage process shows what you receive at each point.
Residential · 4 min read
Your home is furnished but still feels unfinished? Explore seven overlooked details in interior design in Dubai that affect comfort, storage and flow.
Read
Residential · 4 min read
Planning a villa renovation? Discover seven decisions to discuss with interior designers in Dubai before they lead to rework, awkward layouts or scope gaps.
Read
Residential · 4 min read
Is your all-inclusive home quote complete? Learn what to check when comparing interior fit-out companies in Dubai, from design to installation and handover.
ReadGreat experience! The team did an amazing job with my home interiors. Very professional, creative, and reliable. Highly recommended!
MB Mahad B. Google
View on Google, the review by Mahad B. (opens in a new tab)I would like to take a moment to thank the team of Nits decor for beautifully capturing my requirements and executing it on site in q very smooth way. A special thanks for faizan to coordinate about our queries.
RP Raju P. Google
View on Google, the review by Raju P. (opens in a new tab)Loved their work. The designs look great and the team is easy to communicate with. Would definitely recommend.
FH Franklin H. Google
View on Google, the review by Franklin H. (opens in a new tab)Where the structure allows it. Walls are removed with structural support and engineer sign-off, with the relevant authority approvals in place before work begins.
Yes. Demolition, structural works, extensions and full interior reconstruction are carried out by the same team that designs the house. See renovation.
Yes. Every piece is set out against the opening it will occupy and made at our factory in Al Quoz, so storage sits within the wall rather than in front of it.
Roof terraces and external works are part of what we build, detailed so the new work reads as part of the original house.
Yes. Concepts, layouts and mood boards develop into one design direction, presented in 3D so you can walk through every floor before anything is committed. See how a project runs.
Across Dubai and Abu Dhabi. The design studio is on Sheikh Zayed Road in Al Wasl, and the joinery is made at our factory in Al Quoz.
Usually, yes. Master developers ask for an NOC before alterations, and Emaar's community FAQs say any alteration needs its approval and external changes to the homes' appearance are not permitted. Structural changes also need a permit from the authority for the plot. Check your community's guidelines before the design is fixed.
It can work if the works are phased floor by floor and services can be isolated, so one floor with a bathroom and bedrooms stays usable. Work on the stair, the main services or the ground-floor structure affects the whole house, so plan to be away for those stages and settle the arrangement before the programme is written.
With acoustic treatment designed in from the start: slatted acoustic panelling and softer finishes where hard surfaces would carry sound, and attention to the stairwell, which carries sound between floors. Sound through the party wall is harder to treat once the house is finished, so raise it before the design is fixed.
A few details let us come back with something considered rather than generic. We reply to every enquiry from the design team, not a call centre.