Skip to content
Residential · Townhouses

Townhouse interior design in Dubai Every floor, one way of living.

Townhouse interiors and renovations across Dubai and Abu Dhabi — open-plan living, storage built into every floor and family layouts that work from the front door to the roof terrace.

★★★★★ 4.8 out of 5 from 62 Google reviews Read our client reviews

At a glance

Townhouse interior design, in short.

Scope
Ground-floor living, the stair, storage on every level, family rooms and roof terraces.
Where we work
Townhouses across Dubai and Abu Dhabi, from our studio in Al Wasl.
Layout changes
Walls removed only where the structure allows, with engineer sign-off and approvals first.
Joinery
Under-stair cupboards, wardrobes and pantries cut for each opening at our Al Quoz factory.
Before you commit
Every floor walked through in 3D before anything is committed.
One team
Civil works, MEP alterations, joinery and finishing under one site team and programme.
The point

A townhouse is lived vertically. The stair is the hallway, and every floor has to earn the climb.

What is included

What a townhouse project covers.

01

Opening up the ground floor

Where the structure allows it, walls between kitchen, dining and living can come down — removed with structural support, engineer sign-off and the relevant authority approvals in place before work begins.

02

The stair as part of the design

In a townhouse the staircase is seen from every floor. Its lighting, its finishes and the walls around it are designed as one piece rather than left as circulation.

03

Storage on every level

Under-stair storage, wardrobes, dressing rooms, pantries and utility, made to the millimetre for each opening so storage disappears into the wall.

04

Family layouts

Bedrooms, play space and somewhere quiet to work, planned around how the household actually lives — when the house is full and when it is empty. A detached home is planned the same way: see villa interior design.

05

Terraces and outdoor space

Roof terraces and external works can be designed and built as part of the same programme.

06

Light across the floors

Ambient, task and accent lighting on separate circuits with dimming, with colour temperature kept consistent from floor to floor.

Children’s playroom
Children’s playroom
Room for everyone

Planned for the whole household.

Bedrooms, play space and a quiet room to work: the layout is settled first, in 3D, and the joinery is then made in our workshop to fit it.

  • Layouts in 3D first

    Walk through every floor before anything is committed.

  • Joinery made to the opening

    Under-stair cupboards and wardrobes cut for the space they occupy.

  • One programme

    Civil works, MEP alterations, joinery and finishing under one site team.

Residential interiors

Before you start

Before you plan a townhouse floor by floor.

01

Shared walls and community rules

A townhouse shares at least one wall with a neighbour, and often a roofline and a streetscape. That shapes what can change. The party wall carries structure and sound, so cutting into it for a niche, a cable route or a recessed unit needs care and sometimes an engineer's view. Noise also travels through it during the works, and communities set working hours for contractors.

Community rules govern the outside as well. Emaar's community FAQs, for example, say any alteration needs its approval through an NOC, pergolas included, and that external changes altering the look of the homes are not permitted. A roof terrace, a garden structure or new windows need the community's answer before they are designed. Townhouse interior design consultants should raise these in the first meeting.

02

Three floors, one sequence

A townhouse is lived vertically, so its services run vertically too. Bathrooms tend to stack, and the drainage, water and air-conditioning that serve them pass through every floor. Moving a bathroom on the first floor can mean opening the ceiling of the room below. Settle the layout for all floors together before work starts on any of them.

Plan the order of work around the stair. Every delivery and every trade passes through it, so it should be protected throughout and finished last. Finishing upper floors before the ground floor keeps materials and debris away from completed rooms. If you are living in the house, agree which floor stays usable at each stage, and where you will cook while the kitchen is out of use.

03

Finding the storage a townhouse lacks

Townhouse plans are narrow, and storage is usually the first thing they run short of. The places to look are the ones a standard wardrobe cannot use: the triangle under the stair, landing walls, the space beside a column, the depth behind a bedroom door. Each is an awkward shape, and each suits joinery made to the opening.

Begin with a list of what needs a home on each floor: coats and shoes by the front door, cleaning equipment near the kitchen, linen near the bedrooms, luggage and seasonal items somewhere out of the way. Then give each item a place on the floor where it is used. We set out every piece against the opening it will occupy and make it at our factory in Al Quoz.

04

Choosing a townhouse interior designer

Ask a townhouse interior designer for drawings of every floor, the stair included, and for a 3D walkthrough that follows the route from the front door to the roof terrace. A design that treats each floor as a separate project tends to leave the stair as leftover space and the storage short.

Ask any townhouse interior design company who builds the design as well. Opening a ground floor needs structural work, engineer sign-off and approvals; under-stair joinery needs exact measurement; a roof terrace brings waterproofing and external works. With civil works, MEP alterations, joinery and finishing under one site team, those pieces are coordinated by one project manager. Our six-stage process shows what you receive at each point.

Google reviews

In our clients’ own words.

Questions

Questions about townhouse projects.

Can the ground floor be opened up?

Where the structure allows it. Walls are removed with structural support and engineer sign-off, with the relevant authority approvals in place before work begins.

Can you renovate as well as design?

Yes. Demolition, structural works, extensions and full interior reconstruction are carried out by the same team that designs the house. See renovation.

Is under-stair and landing storage made to measure?

Yes. Every piece is set out against the opening it will occupy and made at our factory in Al Quoz, so storage sits within the wall rather than in front of it.

Can you build a roof terrace?

Roof terraces and external works are part of what we build, detailed so the new work reads as part of the original house.

Will I see the townhouse in 3D first?

Yes. Concepts, layouts and mood boards develop into one design direction, presented in 3D so you can walk through every floor before anything is committed. See how a project runs.

Where do you work?

Across Dubai and Abu Dhabi. The design studio is on Sheikh Zayed Road in Al Wasl, and the joinery is made at our factory in Al Quoz.

Does a townhouse renovation need the developer's approval?

Usually, yes. Master developers ask for an NOC before alterations, and Emaar's community FAQs say any alteration needs its approval and external changes to the homes' appearance are not permitted. Structural changes also need a permit from the authority for the plot. Check your community's guidelines before the design is fixed.

Can we live in the townhouse during the works?

It can work if the works are phased floor by floor and services can be isolated, so one floor with a bathroom and bedrooms stays usable. Work on the stair, the main services or the ground-floor structure affects the whole house, so plan to be away for those stages and settle the arrangement before the programme is written.

How do you reduce noise between floors and from neighbours?

With acoustic treatment designed in from the start: slatted acoustic panelling and softer finishes where hard surfaces would carry sound, and attention to the stairwell, which carries sound between floors. Sound through the party wall is harder to treat once the house is finished, so raise it before the design is fixed.

Start here

Tell us about the townhouse.

A few details let us come back with something considered rather than generic. We reply to every enquiry from the design team, not a call centre.

SpaceWhat are we designing?
ConfigurationWhat is the configuration of your space?
Type of spaceWhat kind of space is it?
HandoverWhat is the property’s handover status?

Design can start before the keys arrive. It is how the best projects finish on time.

StartWhen would you like to start?
ScopeWhat would you like us to take on?
SiteWhere is the space?

Not listed? Type the name or address and press Enter.

SizeRoughly how big is it?
NotesAnything we should know?
YouWhere should our designer reach you?

With the country code, e.g. +971 50 123 4567.

Best way to reach you