A survey before a price
The condition of the services, moisture, substrates and any previous alterations is established before anything is priced, so the quote describes the apartment you actually have.
Kitchens, bathrooms and complete refurbishments of apartments across Dubai and Abu Dhabi — surveyed, designed and built by one team, around the rules of your building.
★★★★★ 4.8 out of 5 from 62 Google reviews Read our client reviews
An apartment renovation happens inside someone else’s building. The neighbours, the lifts and the working hours are part of the brief.
The condition of the services, moisture, substrates and any previous alterations is established before anything is priced, so the quote describes the apartment you actually have.
Full kitchen fabrication in our workshop — carcasses, fronts, islands, pantry systems and appliance integration — with fronts matched across runs so the grain reads as one piece of timber.
Waterproofing first, then moisture-rated vanities with sealed edges and stone tops templated on site once the walls are finished.
When everything inside the shell is tired, the finishes, joinery and services are replaced entirely — flooring, ceilings, painting, sanitary and fixtures under one programme.
Building approvals and permitted working hours are planned into the programme, and the sequence of works is agreed before anyone arrives on site.
Ambient, task and accent lighting on separate circuits with dimming, with colour temperature kept consistent from room to room.
Kitchens and bathrooms carry the most services, the most wear and the most moisture. They are fabricated, waterproofed and fitted by our own teams, under the same contract as the rest of the work.
The grain reads as one piece of timber, not a set of separate doors.
Worktops and vanity tops are templated on site once the walls are finished.
The least visible line in the budget, and never treated as optional.
Start with the building management. Its approval normally comes before works begin, and its rules set the hours, lift bookings and protection a renovation has to work within. Changes to the structure, or to how the apartment looks from outside, go further: Law No. 6 of 2019 asks for three approvals, from the competent authority, the Dubai Land Department and the master developer.
Whether Dubai Municipality's permit applies to a home is less clear. DM offers a self permit for decorative works in units larger than 100 square metres, covering suspended ceilings, flooring, shelves and internal partitions that carry no load. Administrative Resolution 85 of 2019, which the permit rests on, defines those units by commercial, professional, industrial and office use and does not mention homes. If your apartment is over 100 m², ask DM or the building which applies before the programme is fixed.
In an apartment, a leak rarely stays in your home. Water through a failed shower floor reaches the ceiling of the flat below, so bathrooms and kitchens are where an apartment renovation in Dubai needs the most care. Our wet areas are waterproofed first, and the membrane should turn up the walls around the shower and along the floor edges before any tile is laid. Moisture-rated vanities with sealed edges go in afterwards.
Ask for the membrane to be flood-tested and photographed before it is covered. Check where the floor drain sits relative to the riser, because a new shower position needs enough fall to reach it. Old isolation valves and pipework inside the apartment are worth replacing while the walls are open. Stone tops are measured on site only after the walls are finished.
Breaking out tiles, chasing walls for cables and coring are the loudest days of an apartment renovation, and the building limits when they can happen. The neighbours hear all of it through the shared structure. A note to the floors above and below, with the dates of the noisiest work, can head off complaints to the building management.
For an apartment renovation in Dubai Marina, or in any busy tower, the service lift and the loading bay are shared with residents and with other flats under works. Debris leaves in bags or bins by the same route, and corridors and lift cars need protecting every day. Our programme includes the building's permitted working hours, and the order of works is agreed with you before the site team arrives.
Some parts of an apartment usually belong to the building rather than the owner. Drainage stacks, water and air-conditioning risers and the structure serve other flats as well, so they stay where they are. Wet rooms tend to stay close to the risers, because waste pipes need a steady fall to reach them, and moving a bathroom across the plan usually means raising the floor.
Fire systems are the other fixed point. Sprinkler heads and smoke detectors belong to the building's system, and a new ceiling or partition has to keep them working. DM's own page for its decorative works permit says no separate Civil Defence approval is needed, though Civil Defence conditions must still be met. Check with the building management before anything connected to its systems is moved, and plan the new layout around what has to stay.
Residential · 4 min read
Is your all-inclusive home quote complete? Learn what to check when comparing interior fit-out companies in Dubai, from design to installation and handover.
Read
Residential · 4 min read
Planning a villa renovation? Discover seven decisions to discuss with interior designers in Dubai before they lead to rework, awkward layouts or scope gaps.
Read
Residential · 4 min read
Comparing interior design companies in Dubai? Discover how scope gaps, allowances and late changes can turn an attractive quote into a bigger final bill.
ReadRecently redecorated my home in Discovery Gardens with NITS Decor and had a really good experience throughout the project.
Their team was professional, responsive, and paid attention to the small details that actually make a difference. The finishing quality, coordination, and execution were handled very smoothly, and the overall transformation came out exactly the way I wanted.
What I appreciated most was their commitment to timelines and the way they managed the entire process without unnecessary hassle.
Highly recommended for anyone looking for interior fit-out and home renovation work in Dubai.
GM Gohel M. Google
View on Google, the review by Gohel M. (opens in a new tab)Amazing finishes and professional team.
And no surprises during execution 😀.
Special Thanks to Shabab and Team Nits …
MA Muhammad A. Google
View on Google, the review by Muhammad A. (opens in a new tab)Had a great experience with NITS Decor. They designed and executed my space exactly according to my vision, comfort, and requirements.
Special thanks to Faizan, the Design Operations Manager, for helping with the right theme and material selection and ensuring every detail came together perfectly. The design team did an excellent job in bringing the entire vision to life.
Highly recommended.
YB Yasmine B. Google
View on Google, the review by Yasmine B. (opens in a new tab)A condition survey of the services, moisture, substrates and any previous alterations, so the price describes the apartment you actually have. See how a project runs.
Usually. Most Dubai towers require approval from building management before works start and limit the hours for noisy work; both are planned into the programme before work begins.
Yes. A full interior reconstruction replaces the finishes, joinery and services within the existing shell — a new interior without the cost and timeline of a new building.
At our factory in Al Quoz Industrial 4: carcasses, fronts, islands and pantry systems, cut for the openings they will occupy and installed by our own team. See the factory.
One site team and one project manager under one programme, from strip-out to final styling.
Yes. The design is presented in 3D so you can walk through it before anything is committed.
Possibly. DM's self permit for decorative works covers ceilings, flooring, shelves and non-structural partitions in units over 100 m², but Administrative Resolution 85 of 2019 defines those units by commercial, professional, industrial and office use. The published rules leave homes unclear, so put the question to DM or your building management. Structural changes need approvals under the jointly owned property law.
Sometimes, within limits. The drainage has to fall to the building's stack, so a bathroom moved far from it may need a raised floor, which changes thresholds and ceiling heights. A new wet room above a neighbour's bedroom can also concern the building management. Check where the risers are early, before the layout is fixed.
Only with the landlord's agreement. Under Law No. 26 of 2007, a tenant needs the landlord's permission and any licences the authorities require before changing the property or carrying out restoration works. The building management's approval is needed as well. Agree in writing what will be done, who pays and what happens to the work when the tenancy ends.
A few details let us come back with something considered rather than generic. We reply to every enquiry from the design team, not a call centre.