Skip to content
Commercial

Commercial interior design in Dubai Environments that carry a business.

Offices, retail, restaurants, salons and hospitality — designed to hold a brand and to survive the operational reality of the people working in them.

★★★★★ 4.8 out of 5 from 62 Google reviews Read our client reviews

At a glance

Commercial interior design, in short.

Sectors
Offices, retail, restaurants and cafés, clinics, salons, hospitality and sales galleries.
Planned against
Desks, covers and queues, with back-of-house routes, deliveries and waste.
Approvals
Submissions to landlords and authorities, fire and life safety, mall and free-zone guidelines.
Trading hours
Noisy work moved out of hours, with phased handovers for businesses that stay open.
Programme
Sequencing agreed before mobilisation, with progress reported against it every week.
Recent work
Boutique Retail Concept at City Walk and DIFC Advisory Office, both designed and built by us.
The point

A commercial interior has to work its first shift, and its thousandth. Those are different problems.

What is included

What a commercial project covers.

01

Operational planning

Covers, seats, desks, queue lengths, back-of-house routes, deliveries and waste. We design against the numbers the business actually runs on, because a plan that looks generous and cannot serve its capacity costs money every day it is open.

02

Brand translation

Taking a brand from a document into three dimensions — materiality, proportion, lighting, signage, and the sequence of what a customer sees first. This is where most fit-outs default to a logo on a wall, and where the difference is most visible.

03

Compliance and approvals

Authority and landlord submissions, fire and life safety, accessibility, mall and free-zone fit-out guidelines, and municipality approvals — handled as part of the programme rather than discovered halfway through it.

04

MEP and services

HVAC, electrical, plumbing, drainage, kitchen extract, data and AV — coordinated with the ceiling and the joinery so services are resolved on paper, not improvised on site.

05

Programme and phasing

Out-of-hours works, phased handovers, and live-trading environments where the business cannot close. Sequencing is agreed before mobilisation and reported against weekly.

DIFC — advisory floor

How a project runs

Six stages, one accountable partner.

Nothing about a premium interior should be improvised. This is the sequence every NITS project follows, and what you receive at each point.

  1. Initial Consultation

    We start with the person, not the room. Requirements, lifestyle or business need, budget, objectives and the real conditions of the site.

    • Requirements
    • Lifestyle
    • Budget
    • Site conditions
  2. Design & Development

    Concepts, layouts and mood boards develop into a single design direction, then into 3D you can walk through before anything is committed.

    • Concepts
    • Layouts
    • Mood boards
    • 3D visualisation
  3. Material Selection

    Finishes, surfaces, furniture, lighting and fixtures are chosen for how they behave over years, not how they photograph on day one.

    • Finishes
    • Surfaces
    • Lighting
    • Textures
  4. Project Planning

    Scope, timeline, procurement, vendors and technical execution are fixed and costed, so the build has no open questions in it.

    • Scope
    • Timeline
    • Procurement
    • Budget
  5. Design Implementation

    Fit-out, joinery, civil works, MEP, installation and finishing — delivered by one accountable team rather than coordinated across five.

    • Fit-out
    • Joinery
    • Civil
    • MEP
    • Finishing
  6. Post-Project Follow-Up

    Final walkthrough, quality check and handover, then continued support once you are living or working in the space.

    • Walkthrough
    • Quality check
    • Handover
    • Support
Before you start

What changes when the space is a business.

01

The landlord has a say

In a home the owner usually decides what happens. In a leased unit the landlord decides first. Dubai's tenancy law, Law No. 26 of 2007, bars a tenant from altering the property unless the landlord permits it and the competent authorities have licensed the work. The same law puts the landlord under a duty to supply the approvals that tenant decoration works call for, provided the structure is untouched.

Most landlords set their conditions out in a fit-out manual or tenant guide. Read it before the layout is fixed and, if you can, before the lease is signed. It can decide where kitchen extract leaves the unit, how services join the base building, which contractors may work there and how the unit is handed back at the end. In the Dubai Development Authority's areas, the contractor's fit-out permit application includes a no objection certificate from the building owner. On commercial projects, landlord and authority submissions sit inside our programme.

02

Which authorities are involved

A home usually answers to its community and one authority. Commercial interior design in Dubai can answer to several. For most of the emirate the authority is Dubai Municipality. Some districts fall under the Dubai Development Authority instead, and establishments in PCFC's jurisdiction (the Ports, Customs and Free Zone Corporation) need a modification NOC or permit from Trakhees before fit-out works. Free zones add their own fit-out guidelines, and Dubai Municipality and the DDA both tie their fit-out rules to Civil Defence conditions for fire and life safety.

Then comes the sector. A restaurant or café layout is approved by Dubai Municipality's Food Control Department before construction. A clinic is planned around its health licence from the first drawing. Ask which of these apply before the design is developed, because each one can move a wall.

03

Working back from the opening date

Most commercial projects have a date fixed before the design began: a lease start, a launch, a season, a move from another office. Rent may be running before the first customer arrives, so the programme carries more weight than it does in a house.

We fix and cost the scope, timeline and procurement in project planning, before the build starts, and order materials, furniture and fittings against the date. Leave room after handover for what happens before opening: staff training, stock, IT set-up, menu trials and photography. A commercial fit-out company in Dubai should be able to show you its programme as a document you can check each week. Ours is reported against weekly.

04

Trading while the work goes on

Offices can sometimes move people to another floor. Shops, restaurants and clinics often have to keep serving customers while part of the space is rebuilt. That changes how the work is planned. Noisy and dusty work moves outside trading hours, each phase is closed off from the public area, and every handover back to the business is a fixed point in the programme.

The customer side needs as much thought as the site. Decide which entrance customers will use, how the work is screened from view and what the signage says while it is going on. Ask the building how fire alarms and exits are kept in service for the part that stays open. We plan out-of-hours works and phased handovers before mobilisation and agree the sequence with you first.

05

Choosing a commercial fit-out company

Ask each company the same questions. Who draws the services and gets them approved? Who makes the reception desk, the bar or the display units, and who puts them right if they arrive the wrong size? Who deals with the landlord's technical team? Then ask to see work in your sector.

Our sector pages set out what changes for each kind of business: office interior design and office fit-out, clinics, restaurants and cafés, and real estate offices and sales galleries. In each, one contract covers design, MEP, joinery and fit-out, and our Al Quoz factory makes the joinery.

Google reviews

In our clients’ own words.

  • ★★★★★

    Great experience working with this company. Their designs are modern, functional, and beautifully executed. Very professional team with outstanding results.

  • ★★★★★

    Excellent service and quality work. The team delivered exactly what we wanted on time and with great attention to detail.

  • ★★★★★

    We had an amazing experience with Nits Decor LLC from start to finish. The entire team was very professional, knowledgeable, helpful, and easy to work with. The whole process was smooth, the execution was handled very well, and we were extremely happy with the quality of the work and final finishes. The project was completed beautifully and the handover process was also smooth and well managed.

    A special thanks to Reenaz, who guided us from the very beginning. She patiently helped us understand the process and really built our confidence and trust in Nits Decor, which made us comfortable moving forward with the project.

    A big shoutout to Nabil, the Sales Manager, who was extremely supportive and helped us work out a crazy good deal while making sure our requirements were taken care of.

    Also, special appreciation to our Project Manager, Uday, who did an amazing job during the execution. He was supportive, responsive, and made sure everything on site was properly coordinated and executed as planned.

    Overall, we are very happy with the quality, professionalism, execution, and service provided by Nits Decor LLC. Definitely a 5-star experience and highly recommended for anyone looking for a reliable interior company in Dubai!

Questions

Questions about commercial projects.

Which commercial spaces do you design?

Offices, retail, restaurants, salons and hospitality environments — designed to carry a brand and to work operationally, shift after shift.

Do you handle authority and landlord approvals?

Yes. Authority and landlord submissions, fire and life safety, accessibility, mall and free-zone fit-out guidelines and municipality approvals are handled as part of the programme rather than discovered halfway through it.

Can you work while our business stays open?

Yes. Out-of-hours works, phased handovers and live-trading environments where the business cannot close are planned for: sequencing is agreed before mobilisation and reported against weekly.

How are MEP and services coordinated?

HVAC, electrical, plumbing, drainage, kitchen extract, data and AV are coordinated with the ceiling and the joinery, so services are resolved on paper rather than improvised on site.

How do you design around our operations?

Against the numbers the business runs on — covers, seats, desks, queue lengths, back-of-house routes, deliveries and waste — because a plan that cannot serve its capacity costs money every day it is open.

Who is accountable for the project?

One team, under one contract: design, MEP, joinery and fit-out with a single point of responsibility. See turnkey fit-out.

Should we sign the lease before the design starts?

Test the unit before you sign if you can. A first layout shows whether the space holds your desks, covers or treatment rooms, and the landlord's fit-out manual shows what the building allows. A restaurant's layout needs Dubai Municipality's approval before construction, and a clinic's licence sets its own room requirements. A problem found after signing leaves fewer options.

Do you fit out units in shopping malls?

Yes. Mall fit-out guidelines and landlord submissions are handled within the programme, with out-of-hours works where the centre requires them. Some authority permits fall away for mall units, while others still apply: a restaurant or café, for example, still needs its layout approved by Dubai Municipality's Food Control Department. The restaurant page sets out that route.

How is a commercial budget set?

From the scope and the condition the unit is handed over in, more than the floor area. An empty shell needs more building work than a unit whose previous fit-out can be reused, and kitchens, treatment rooms and acoustic rooms carry heavy services. During project planning the scope, timeline and procurement are fixed and priced item by item from the drawings, before the build starts.

Start here

Tell us about the space.

A few details let us come back with something considered rather than generic. We reply to every enquiry from the design team, not a call centre.

SpaceWhat are we designing?
ConfigurationWhat is the configuration of your space?
Type of spaceWhat kind of space is it?
HandoverWhat is the property’s handover status?

Design can start before the keys arrive. It is how the best projects finish on time.

StartWhen would you like to start?
ScopeWhat would you like us to take on?
SiteWhere is the space?

Not listed? Type the name or address and press Enter.

SizeRoughly how big is it?
NotesAnything we should know?
YouWhere should our designer reach you?

With the country code, e.g. +971 50 123 4567.

Best way to reach you