Office fit-out company in Dubai From a bare floor to an office that works.

Office fit-out in Dubai and Abu Dhabi under one contract — design, MEP, joinery, procurement, installation and project management, with one point of responsibility.

★★★★★ 4.8 out of 5 from 62 Google reviews Read our client reviews

At a glance

Office fit-out, in short.

Scope
Design, MEP, joinery, procurement, installation and project management under one contract.
Starting point
A bare floor, or an existing office that needs stripping out first.
Approvals
Landlord, municipality and free-zone submissions, fire and life safety, handled within the programme.
Occupied floors
Out-of-hours works and phased handovers, sequenced before mobilisation.
Reporting
Progress reported against the programme every week; one project manager throughout.
Joinery
Reception desks, storage and display joinery made at our Al Quoz Industrial 4 workshop.
The point

An office fit-out has one date that matters: the day the team moves in. Everything else is how you get there.

What is included

What an office fit-out covers.

01

Design and documentation

Concept, layouts, 3D visualisation, material selection, technical drawings and a full bill of quantities — so you approve a design you have walked through, against a cost you have seen itemised.

02

Bare floors and existing offices

Civil works, MEP, ceilings, flooring, joinery installation, finishing and snagging, whether the floor arrives as a bare shell or as an existing office that needs stripping out first.

03

MEP, data and AV

HVAC, electrical, plumbing, data and AV coordinated with the ceiling and the joinery before mobilisation, so nothing is improvised on site.

04

Approvals

Landlord and authority submissions, fire and life safety, accessibility, free-zone fit-out guidelines and municipality approvals, handled as part of the programme.

05

Procurement

Materials, furniture, lighting, sanitary and fixtures sourced through our supply chain, with lead times built into the programme rather than discovered against it.

06

Handover

Final walkthrough, quality check, documentation and warranties, then continued support once your team is working in the space.

Design development
Design development
Programme

Fit-outs for offices that cannot close.

Out-of-hours works, phased handovers and occupied floors are planned before mobilisation, and progress is reported against the programme every week.

  • Sequencing agreed first

    Agreed before mobilisation, reported against weekly.

  • Our own site teams

    Construction and installation supervised daily.

  • One project manager

    One point of contact from consultation to handover.

Turnkey fit-out

Before you start

From the lease to move-in day.

01

Category A or Category B

Offices in Dubai are often leased as shell and core or at Category A. Shell and core is the base building with little internal finish. Category A, or Cat A, adds a basic working environment such as a ceiling, raised floor or screed, lighting and air-conditioning distribution. Definitions vary between buildings, so read the landlord's handover specification rather than the label.

Category B, or Cat B fit-out, makes the space your office: partitions, meeting rooms, finishes, pantry, joinery, furniture and technology. On a Cat A floor, part of the Cat B work is usually adapting what the landlord installed, such as moving air-conditioning outlets and light fittings to suit new rooms. The lease may also require you to return the space to its original state when you leave. Price that now.

02

Who approves an office fit-out

The landlord approves through its fit-out manual and NOC process. The authority depends on location. In Dubai Municipality's area, decorative works in a commercial or office unit over 100 m², such as suspended ceilings, flooring, shelving and non-structural partitions, need a permit applied for by a DM-approved contractor; units in shopping malls are exempt. In the Dubai Development Authority's areas the contractor applies for a fit-out permit. Circular 338 removed that permit for units of 100 m² or less and for mall units, unless the work changes structure, use or unit boundaries or adds a mezzanine. On Trakhees land, its modification NOC comes before any fit-out work.

Fire and life-safety changes follow Civil Defence requirements everywhere. We handle these submissions as part of the programme.

03

Fitting out around a working team

When the business cannot close, the fit-out is planned around it. The first decision is the phasing: which areas are handed over first, where people sit in the meantime, and when IT, phones and access control move across. Noisy work such as demolition, coring and cutting usually moves to evenings or weekends, within the building's rules on working hours, lifts and deliveries.

Each phase needs a clean boundary between the working office and the site: dust screens, protected routes, and a plan for any fire alarm or sprinkler isolation so the occupied area stays covered. We agree the sequence before mobilisation and report against it every week, so the business can plan around each change.

04

What moves an office fit-out budget

Floor area sets the scale, while the starting condition and the scope decide the cost. A shell needs ceilings, floors and services that a Cat A floor already has. Changes to air-conditioning zones, fire detection, sprinklers and power to suit new rooms are easy to underestimate because they are out of sight. Full-height glass, acoustic partitions, feature ceilings and out-of-hours work all cost more than the standard alternatives.

Two splits often cause confusion between quotes: furniture, fixtures and equipment, and IT and audio-visual systems. Decide who supplies, installs and coordinates each before you compare totals. Our own proposals are costed against a full bill of quantities, and the guide to office budget mistakes covers seven decisions that lead to extra work.

05

Leaving time before move-in day

Plan the last weeks before move-in as carefully as the first. The fit-out needs time for testing, a snagging walk and corrections before furniture and IT arrive, and IT installers need a finished, clean floor to work on. Squeezing the inspection into the moving weekend means snags are fixed around desks and people. Coordinate furniture delivery and technology set-up with the fit-out programme, so each team knows when the floor is ready for its work.

Agree what you will receive at handover: a final walkthrough, a quality check, documentation and warranties. Ask how a defect found after move-in is reported, and who attends.

Google reviews

In our clients’ own words.

Questions

Questions about office fit-out.

What does a turnkey office fit-out include?

Design and documentation, procurement, construction and installation, and handover: design, MEP, joinery, procurement, installation and project management under one contract. See office interior design for the design stage.

Can you fit out an office we are still using?

Yes. Out-of-hours works, phased handovers and live environments are planned for; sequencing is agreed before mobilisation and reported against weekly.

Who handles the approvals?

We do, as part of the programme: authority and landlord submissions, fire and life safety, accessibility, free-zone fit-out guidelines and municipality approvals.

How do we know what it will cost?

You approve a design against a full bill of quantities, after the scope, timeline and procurement have been fixed and costed in project planning. See how a project runs.

Who builds the joinery?

Our own workshop in Al Quoz Industrial 4: reception desks, storage and display joinery built to commercial durability standards and installed by our team. See the factory.

What do we receive at handover?

A final walkthrough, quality check, documentation and warranties, then continued support once your team is working in the space.

Does a small office need a fit-out permit?

Often not, though it depends on the authority and the scope. Dubai Municipality's decorative works permit applies to commercial and office units over 100 m², and the Dubai Development Authority removed its fit-out permit for units of 100 m² or less. Structural changes, a change of use or merging units still need approval, Trakhees asks for its NOC whatever the size, and the landlord's consent is always needed.

Can you strip out the previous tenant's fit-out?

Yes. Many offices arrive with an existing fit-out that has to come out before new work starts, and strip-out is part of our scope. Check the lease first: some require the space to be returned to the landlord's original specification at the end. That affects what is removed now and what is kept.

Do you supply the office furniture?

Furniture can be part of the fit-out. Materials, furniture, lighting, sanitary ware and fixtures are sourced through our supply chain, with lead times built into the programme. If you supply some pieces yourself, agree who receives, assembles and installs them, and when they arrive relative to the fit-out.

Start here

Tell us about the office.

A few details let us come back with something considered rather than generic. We reply to every enquiry from the design team, not a call centre.

SpaceWhat are we designing?
ConfigurationWhat is the configuration of your space?
Type of spaceWhat kind of space is it?
HandoverWhat is the property’s handover status?

Design can start before the keys arrive. It is how the best projects finish on time.

StartWhen would you like to start?
ScopeWhat would you like us to take on?
SiteWhere is the space?

Not listed? Type the name or address and press Enter.

SizeRoughly how big is it?
NotesAnything we should know?
YouWhere should our designer reach you?

With the country code, e.g. +971 50 123 4567.

Best way to reach you