Skip to content
Renovation

Renovation company in Dubai The projects where nothing stays hidden.

Demolition, structural repair, extensions and full interior reconstruction — the work where turnkey accountability matters most, because the surprises are structural.

★★★★★ 4.8 out of 5 from 62 Google reviews Read our client reviews

At a glance

Home renovation in Dubai, in short.

Starts with
A survey of what lies behind the finishes, so the price reflects the real building.
Scope
Strip-out, wall removals, slab openings, extensions and full interior reconstruction.
Structural work
Waits for an engineer's sign-off and the authority's approval before it starts.
Homes
Villas, townhouses and apartments, renovated by the team that designs them.
Waterproofing
Wet areas, terraces, planters and below-grade zones treated as structure, never as an extra.
Responsibility
Whatever the strip-out uncovers is put right by the team that uncovered it.
The point

On a renovation the design is the easy part. What matters is who is responsible when the wall comes down.

What is included

What a renovation project covers.

01

Condition survey

Before anything is priced we establish what is actually there: structure, services, moisture, substrate condition and any previous alterations. A renovation quoted without this is a guess, and the difference gets discovered at your expense.

02

Demolition and structural works

Controlled strip-out, wall removals with structural support, slab openings, beam installation and reinstatement — with engineer sign-off and the relevant authority approvals in place before work begins.

03

Extensions and additions

Room additions, majlis and annexe construction, roof terraces and external works — detailed so the new fabric reads as part of the original building rather than an appendage bolted to it.

04

Full interior reconstruction

Complete replacement of finishes, joinery and services within an existing shell — the option that gives you a new interior without the cost and timeline of a new building.

05

Waterproofing and remediation

Wet areas, terraces, planters and below-grade zones. The least visible line in a renovation budget, and the one most likely to cause expensive damage if it is treated as optional.

Structural works

How a project runs

Six stages, one accountable partner.

Nothing about a premium interior should be improvised. This is the sequence every NITS project follows, and what you receive at each point.

  1. Initial Consultation

    We start with the person, not the room. Requirements, lifestyle or business need, budget, objectives and the real conditions of the site.

    • Requirements
    • Lifestyle
    • Budget
    • Site conditions
  2. Design & Development

    Concepts, layouts and mood boards develop into a single design direction, then into 3D you can walk through before anything is committed.

    • Concepts
    • Layouts
    • Mood boards
    • 3D visualisation
  3. Material Selection

    Finishes, surfaces, furniture, lighting and fixtures are chosen for how they behave over years, not how they photograph on day one.

    • Finishes
    • Surfaces
    • Lighting
    • Textures
  4. Project Planning

    Scope, timeline, procurement, vendors and technical execution are fixed and costed, so the build has no open questions in it.

    • Scope
    • Timeline
    • Procurement
    • Budget
  5. Design Implementation

    Fit-out, joinery, civil works, MEP, installation and finishing — delivered by one accountable team rather than coordinated across five.

    • Fit-out
    • Joinery
    • Civil
    • MEP
    • Finishing
  6. Post-Project Follow-Up

    Final walkthrough, quality check and handover, then continued support once you are living or working in the space.

    • Walkthrough
    • Quality check
    • Handover
    • Support
Before you start

What to settle before a renovation starts.

01

Why the survey comes first

A home renovation company in Dubai can only quote as well as it knows the building. Our survey covers structure, services, damp, the state of the substrates and work done by earlier owners, and the price is built from its findings.

You can make the survey more useful. Tell us what you already know: the room that always smells damp, the circuit that trips, the door that began sticking last summer, the bathroom someone retiled over old tiles. Bring any drawings, the developer's handover pack and approvals for earlier work. Some things only show once walls are open, so decide now who records them, how they are priced and who signs off the extra work.

02

What a renovation can change

Home renovation in Dubai covers very different amounts of work, and it helps to name yours. A refresh replaces finishes and leaves services and layout alone. A kitchen or bathroom renovation replaces the services in those rooms as well. A layout change moves or removes walls, which brings an engineer and approvals into the project. An extension, a new majlis or an annexe adds structure and usually external works. A full interior reconstruction keeps the shell and replaces the finishes, joinery and services inside it.

Each step up adds approvals, disruption and cost, so decide which one you need before asking for prices. Sometimes the survey shows that a refresh would sit on top of services near the end of their life, and that is better known before a new floor goes down.

03

Approvals at a glance

Most home renovations answer to two parties. The first is the community or the building. Emaar Community Management's FAQ for The Valley says every villa alteration needs Emaar's approval, requested as an NOC on the community portal. Nakheel's customer FAQs require owners to get an Urban Planning NOC from Nakheel before altering a home, and allow only work that leaves the external façade and the structure as they are. Contractors on Nakheel modification work also need Nakheel and Trakhees NOCs. In an apartment, the building management's rules come first.

The second is the authority. Dubai Municipality issues permits for modifications or additions to existing buildings, and the Dubai Development Authority issues building modification permits in its areas. Structural changes to an apartment also need three approvals under Law No. 6 of 2019: the competent authority's, the Dubai Land Department's and the master developer's. Our villa renovation and apartment renovation pages follow each route.

04

Living at home through a renovation

A renovation site and a family home make awkward neighbours. Demolition and cutting fill the air with fine dust that settles in every room left unsealed. Water and power have to be isolated whenever services are replaced. Open floors, cables and tools are a hazard for children and pets.

If you plan to stay, agree a line the works do not cross and keep the lived-in side sealed. Ask for a clean route to the front door, and for the noisiest and dustiest stages to be grouped, so you can be away for those days only. Find out in advance when water and power will be off, so the household can plan around it. Moving out for strip-out and structural work, and back for the finishing trades, is one workable pattern.

05

The order the trades follow

Renovations run in a fixed order because each trade covers the work of the one before. Strip-out comes first, then structural work. Services follow inside walls, floors and ceilings: drainage, water, electrical and air-conditioning. Wet areas are waterproofed, and the membrane should be tested while it is still exposed. Screeds, plaster and ceilings close everything in. Then come tiles and flooring, joinery installation, stone tops templated once the walls are finished, painting, and finally sanitary ware, fittings and lighting.

The order explains why late changes cost more. Moving a socket after plastering means cutting into a finished wall, and moving a basin after tiling means breaking tiles and possibly the waterproofing under them. Settle positions on the drawings before services go in. Our six-stage process shows where those decisions are made.

Google reviews

In our clients’ own words.

  • ★★★★★

    Absolutely outstanding experience! From the initial consultation to the final handover, the team demonstrated exceptional creativity, professionalism, and attention to detail. They truly understood our vision and transformed our space beyond expectations. The quality of materials and execution was top-notch, and the entire process was smooth and well-managed. Highly recommended for anyone looking for a reliable and innovative interior design company.

  • ★★★★★

    I had a great experience with the team. Very professional, creative and great execution. I would recommend this platform.

  • ★★★★★

    Their work is beautiful and organized, and I was truly delighted to deal with you. Thank you very much.

Questions

Questions about renovation.

What does a renovation start with?

A condition survey. Structure, services, moisture, substrate condition and any previous alterations are established before anything is priced.

Do you carry out structural changes?

Yes — controlled strip-out, wall removals with structural support, slab openings, beam installation and reinstatement, with engineer sign-off and the relevant authority approvals in place before work begins.

Can you extend a villa?

Yes: room additions, majlis and annexe construction, roof terraces and external works, detailed so the new fabric reads as part of the original building.

Can the interior be rebuilt without rebuilding the house?

Yes. A full interior reconstruction replaces the finishes, joinery and services within the existing shell — a new interior without the cost and timeline of a new building.

Why does waterproofing matter so much?

Wet areas, terraces, planters and below-grade zones are the least visible line in a renovation budget, and the one most likely to cause expensive damage if it is treated as optional.

Who is responsible when something is found behind a wall?

The team that designs and builds the project — one contract and one point of responsibility, which is why the survey comes before the price.

Can you renovate only the kitchen and bathrooms?

Yes. Kitchens are fabricated in our workshop, and bathrooms are rebuilt with waterproofing first, moisture-rated vanities and stone templated on site. The survey still comes first, because the pipes and drains that serve those rooms run through the rest of the home, and their condition decides whether they can stay.

Should we renovate before moving in or after?

Before, if you can. An empty home is simpler to protect and to work in, services can be isolated without disrupting anyone, and furniture is moved once rather than twice. If you have to move in first, plan the work in phases around the rooms you need, and settle that order before the programme is written.

Do you renovate apartments as well as villas?

Yes. Apartment work runs within the building's rules: building-management approval, permitted hours for noisy work and lift bookings are planned into the programme. Villas and townhouses need the community's NOC, plus an authority permit once the structure changes. The apartment renovation and villa renovation pages describe each kind of project in more detail.

Start here

Tell us about the property.

A few details let us come back with something considered rather than generic. We reply to every enquiry from the design team, not a call centre.

SpaceWhat are we designing?
ConfigurationWhat is the configuration of your space?
Type of spaceWhat kind of space is it?
HandoverWhat is the property’s handover status?

Design can start before the keys arrive. It is how the best projects finish on time.

StartWhen would you like to start?
ScopeWhat would you like us to take on?
SiteWhere is the space?

Not listed? Type the name or address and press Enter.

SizeRoughly how big is it?
NotesAnything we should know?
YouWhere should our designer reach you?

With the country code, e.g. +971 50 123 4567.

Best way to reach you