Design and documentation
Concept, layouts, 3D visualisation, material selection, technical drawings and a full bill of quantities — so you approve a design you have walked through, against a cost you have seen itemised.
Office fit-out in Dubai and Abu Dhabi under one contract — design, MEP, joinery, procurement, installation and project management, with one point of responsibility.
★★★★★ 4.8 out of 5 from 62 Google reviews Read our client reviews
An office fit-out has one date that matters: the day the team moves in. Everything else is how you get there.
Concept, layouts, 3D visualisation, material selection, technical drawings and a full bill of quantities — so you approve a design you have walked through, against a cost you have seen itemised.
Civil works, MEP, ceilings, flooring, joinery installation, finishing and snagging, whether the floor arrives as a bare shell or as an existing office that needs stripping out first.
HVAC, electrical, plumbing, data and AV coordinated with the ceiling and the joinery before mobilisation, so nothing is improvised on site.
Landlord and authority submissions, fire and life safety, accessibility, free-zone fit-out guidelines and municipality approvals, handled as part of the programme.
Materials, furniture, lighting, sanitary and fixtures sourced through our supply chain, with lead times built into the programme rather than discovered against it.
Final walkthrough, quality check, documentation and warranties, then continued support once your team is working in the space.
Out-of-hours works, phased handovers and occupied floors are planned before mobilisation, and progress is reported against the programme every week.
Agreed before mobilisation, reported against weekly.
Construction and installation supervised daily.
One point of contact from consultation to handover.
Offices in Dubai are often leased as shell and core or at Category A. Shell and core is the base building with little internal finish. Category A, or Cat A, adds a basic working environment such as a ceiling, raised floor or screed, lighting and air-conditioning distribution. Definitions vary between buildings, so read the landlord's handover specification rather than the label.
Category B, or Cat B fit-out, makes the space your office: partitions, meeting rooms, finishes, pantry, joinery, furniture and technology. On a Cat A floor, part of the Cat B work is usually adapting what the landlord installed, such as moving air-conditioning outlets and light fittings to suit new rooms. The lease may also require you to return the space to its original state when you leave. Price that now.
The landlord approves through its fit-out manual and NOC process. The authority depends on location. In Dubai Municipality's area, decorative works in a commercial or office unit over 100 m², such as suspended ceilings, flooring, shelving and non-structural partitions, need a permit applied for by a DM-approved contractor; units in shopping malls are exempt. In the Dubai Development Authority's areas the contractor applies for a fit-out permit. Circular 338 removed that permit for units of 100 m² or less and for mall units, unless the work changes structure, use or unit boundaries or adds a mezzanine. On Trakhees land, its modification NOC comes before any fit-out work.
Fire and life-safety changes follow Civil Defence requirements everywhere. We handle these submissions as part of the programme.
When the business cannot close, the fit-out is planned around it. The first decision is the phasing: which areas are handed over first, where people sit in the meantime, and when IT, phones and access control move across. Noisy work such as demolition, coring and cutting usually moves to evenings or weekends, within the building's rules on working hours, lifts and deliveries.
Each phase needs a clean boundary between the working office and the site: dust screens, protected routes, and a plan for any fire alarm or sprinkler isolation so the occupied area stays covered. We agree the sequence before mobilisation and report against it every week, so the business can plan around each change.
Floor area sets the scale, while the starting condition and the scope decide the cost. A shell needs ceilings, floors and services that a Cat A floor already has. Changes to air-conditioning zones, fire detection, sprinklers and power to suit new rooms are easy to underestimate because they are out of sight. Full-height glass, acoustic partitions, feature ceilings and out-of-hours work all cost more than the standard alternatives.
Two splits often cause confusion between quotes: furniture, fixtures and equipment, and IT and audio-visual systems. Decide who supplies, installs and coordinates each before you compare totals. Our own proposals are costed against a full bill of quantities, and the guide to office budget mistakes covers seven decisions that lead to extra work.
Plan the last weeks before move-in as carefully as the first. The fit-out needs time for testing, a snagging walk and corrections before furniture and IT arrive, and IT installers need a finished, clean floor to work on. Squeezing the inspection into the moving weekend means snags are fixed around desks and people. Coordinate furniture delivery and technology set-up with the fit-out programme, so each team knows when the floor is ready for its work.
Agree what you will receive at handover: a final walkthrough, a quality check, documentation and warranties. Ask how a defect found after move-in is reported, and who attends.
Commercial · 4 min read
Protect your office fit-out budget. Explore seven mistakes in office interior design in Dubai around layouts, procurement, services and project handover.
Read
Residential · 4 min read
Is your all-inclusive home quote complete? Learn what to check when comparing interior fit-out companies in Dubai, from design to installation and handover.
Read
Residential · 4 min read
Comparing interior design companies in Dubai? Discover how scope gaps, allowances and late changes can turn an attractive quote into a bigger final bill.
ReadA great Fit-Out Company that delivers quality, cost-friendly and fast work. Has had multiple projects with branded firms and corporations. Would strongly recommend for small, medium and moderately large projects
AM afsar m. Google
View on Google, the review by afsar m. (opens in a new tab)Professional and reliable team with great attention to detail. They provided excellent design ideas and executed the project seamlessly from start to finish. Highly recommended for anyone looking for quality interior design and fit-out services.
MJ Muhammad J. Google
View on Google, the review by Muhammad J. (opens in a new tab)Great experience! Very professional team, creative designs, and smooth execution. Highly recommend for interior and fit-out work.
NQ Nabil Q. Google
View on Google, the review by Nabil Q. (opens in a new tab)Design and documentation, procurement, construction and installation, and handover: design, MEP, joinery, procurement, installation and project management under one contract. See office interior design for the design stage.
Yes. Out-of-hours works, phased handovers and live environments are planned for; sequencing is agreed before mobilisation and reported against weekly.
We do, as part of the programme: authority and landlord submissions, fire and life safety, accessibility, free-zone fit-out guidelines and municipality approvals.
You approve a design against a full bill of quantities, after the scope, timeline and procurement have been fixed and costed in project planning. See how a project runs.
Our own workshop in Al Quoz Industrial 4: reception desks, storage and display joinery built to commercial durability standards and installed by our team. See the factory.
A final walkthrough, quality check, documentation and warranties, then continued support once your team is working in the space.
Often not, though it depends on the authority and the scope. Dubai Municipality's decorative works permit applies to commercial and office units over 100 m², and the Dubai Development Authority removed its fit-out permit for units of 100 m² or less. Structural changes, a change of use or merging units still need approval, Trakhees asks for its NOC whatever the size, and the landlord's consent is always needed.
Yes. Many offices arrive with an existing fit-out that has to come out before new work starts, and strip-out is part of our scope. Check the lease first: some require the space to be returned to the landlord's original specification at the end. That affects what is removed now and what is kept.
Furniture can be part of the fit-out. Materials, furniture, lighting, sanitary ware and fixtures are sourced through our supply chain, with lead times built into the programme. If you supply some pieces yourself, agree who receives, assembles and installs them, and when they arrive relative to the fit-out.
A few details let us come back with something considered rather than generic. We reply to every enquiry from the design team, not a call centre.