Interior fit-out company in Dubai One contract. One programme. One responsibility.

Concept to completion under a single accountable partner — design, MEP, joinery, procurement, installation and project management.

  1. 01 The shell Slab, columns and a raw opening, as found.
  2. 02 Measured and drawn Every service and partition drawn before work starts.
  3. 03 Services Ducts and conduits routed under the slab.
  4. 04 A new ceiling The services disappear above it.
  5. 05 Walls and floor Partitions, plaster and stone.
  6. 06 Joinery and light Joinery made in our Al Quoz factory, installed on site.
  7. 07 Handover Finished, lit and ready to use.
Skip the animation

★★★★★ 4.8 out of 5 from 62 Google reviews Read our client reviews

At a glance

Turnkey fit-out, in short.

Contract
One contract covering design, MEP, joinery, procurement, installation and project management.
Point of contact
One project manager from the first consultation to handover.
On site
Our own site teams, supervised daily: civil works, MEP, ceilings, flooring, joinery and snagging.
Procurement
Materials, furniture, lighting, sanitary ware and fixtures sourced with lead times in the programme.
Cost
Fixed against technical drawings and a full bill of quantities before the build starts.
Handover
Walkthrough, quality check, documentation and warranties, then continued support.
The point

When the designer and the contractor are the same company, there is nobody left to blame. That is the point.

What is included

What turnkey actually means.

01

A single point of contact

One project manager from consultation to handover. You are not coordinating between a designer, a contractor, a joiner and an MEP subcontractor, and you are not absorbing the cost of the gaps between them.

02

Design and documentation

Concept, layouts, 3D visualisation, material selection, technical drawings and a full bill of quantities. You approve a design you have walked through, against a cost you have seen itemised.

03

Procurement

Materials, furniture, lighting, sanitary and fixtures sourced through our supply chain, with lead times built into the programme rather than discovered against it.

04

Construction and installation

Civil works, MEP, ceilings, flooring, joinery installation, finishing and snagging — executed by our own site teams and supervised daily.

05

Handover and aftercare

Final walkthrough, quality check, documentation and warranties, then continued support once you are living or working in the space. We would rather fix something in month three than lose the reference.

Marina — penthouse

How a project runs

Six stages, one accountable partner.

Nothing about a premium interior should be improvised. This is the sequence every NITS project follows, and what you receive at each point.

  1. Initial Consultation

    We start with the person, not the room. Requirements, lifestyle or business need, budget, objectives and the real conditions of the site.

    • Requirements
    • Lifestyle
    • Budget
    • Site conditions
  2. Design & Development

    Concepts, layouts and mood boards develop into a single design direction, then into 3D you can walk through before anything is committed.

    • Concepts
    • Layouts
    • Mood boards
    • 3D visualisation
  3. Material Selection

    Finishes, surfaces, furniture, lighting and fixtures are chosen for how they behave over years, not how they photograph on day one.

    • Finishes
    • Surfaces
    • Lighting
    • Textures
  4. Project Planning

    Scope, timeline, procurement, vendors and technical execution are fixed and costed, so the build has no open questions in it.

    • Scope
    • Timeline
    • Procurement
    • Budget
  5. Design Implementation

    Fit-out, joinery, civil works, MEP, installation and finishing — delivered by one accountable team rather than coordinated across five.

    • Fit-out
    • Joinery
    • Civil
    • MEP
    • Finishing
  6. Post-Project Follow-Up

    Final walkthrough, quality check and handover, then continued support once you are living or working in the space.

    • Walkthrough
    • Quality check
    • Handover
    • Support
Scope, stage by stage

What a turnkey fit-out includes.

One contract, six stages

StageWhat is includedWhat you receive
Project managementOne project manager from the first consultation to handover, with our site teams supervised daily.One person to ask, who knows the whole project.
Design and documentationConcept, layouts, 3D visualisation, material selection, technical drawings and a full bill of quantities.A design you have walked through in 3D, and its cost itemised before the build starts.
ApprovalsOn commercial projects, landlord and authority submissions, fire and life safety, accessibility and free-zone guidelines. On homes, structural changes go ahead only with engineer sign-off and the relevant approvals.Each approval planned into the programme and in place before the work it covers. A developer or building NOC usually starts with the owner's request.
ProcurementMaterials, furniture, lighting, sanitary ware and fixtures, sourced through our supply chain.Lead times built into the programme rather than discovered against it.
Construction and installationStrip-out and civil works, air-conditioning, electrical, plumbing and data, ceilings, flooring, joinery installation, finishing and snagging, by our own site teams.Each trade in its set order, and joinery made to the measured opening.
Handover and aftercareFinal walkthrough, quality check, documentation and warranties.Continued support once you are living or working in the space.
Before you start

How a fit-out comes together.

01

Comparing fit-out companies in Dubai

Fit-out proposals are hard to compare because each one tends to price a slightly different job. Before you shortlist interior fit-out companies in Dubai, prepare one brief and one set of drawings and send the same pack to every firm. Ask each to price it item by item and to list what it has assumed, allowed for and excluded.

Compare responsibilities alongside prices. Who produces the technical drawings? Who buys the materials, and who checks items you supply yourself? Who coordinates air-conditioning, power and data with the ceilings and joinery? Who manages the programme and reports to you? A fit-out contractor in Dubai who answers each question in writing gives you something to hold them to. Our checklist for testing an all-inclusive quote covers the same ground in more detail.

02

Approvals, and who signs them

Most fit-outs need consent from two directions. The landlord, building management or master developer issues a no objection certificate (NOC) and sets its own fit-out rules. The authority for the land issues the permit: Dubai Municipality across most of Dubai, the Dubai Development Authority in the areas it regulates, and Trakhees on land under the Ports, Customs and Free Zone Corporation. Fire and life-safety changes bring in Civil Defence, and additional electrical load goes to DEWA.

Authority applications are made by registered consultants or contractors, while a developer's NOC usually starts with the owner's request. On commercial fit-outs we handle landlord and authority submissions as part of the programme, so each approval is planned alongside the design and in place before the work it covers begins.

03

The order of work on site

A fit-out runs in a set order because each trade covers the one before it. Strip-out and civil works come first, then the services that will sit inside walls and above ceilings: air-conditioning, electrical, plumbing and data. Ceilings close once those services are in place and coordinated with the light positions. Flooring follows, then joinery installation, finishing and snagging.

Two steps wait for the finished room. Joinery is made to the measured opening, and stone worktops and vanity tops are templated on site once the walls are finished. A late change, made after a ceiling is closed or a cabinet is cut, reaches back through every step that followed it. That is why we settle and cost the design before mobilisation.

04

What sets the programme

How long a fit-out takes depends on more than its floor area. Lead times for joinery, stone, lighting and imported fittings matter, as do the approvals the scope needs and the hours the building allows for noisy work and deliveries. So does the amount of strip-out before new work can start. A duration given before these are known can only be a rough estimate.

In project planning we fix the scope, timeline, procurement and vendors together, with each long lead time placed in the programme from the start. On commercial fit-outs, progress is then reported against that programme every week. For an early view of timing on your own project, bring the drawings, the building's fit-out rules and your target date to the first consultation.

Google reviews

In our clients’ own words.

  • ★★★★★

    We had a wonderful experience working with Nits interior design and fit-out company. From the very first meeting, their team listened carefully to our ideas and brought creative solutions that perfectly matched our vision. The designs were not only beautiful but also practical and functional.

  • ★★★★★

    We are extremely happy with the results and highly recommend NITS Decor LLC to anyone looking for high-quality interior design and fit-out services.

  • ★★★★★

    We had a wonderful experience with Nits Decor from the initial consultation all the way through to the successful completion and handover of our project.

    A special thanks to Simran, who guided us from the very beginning. She was professional, responsive, and transparent throughout the process, and gave us the confidence to move forward with Nits Decor.

    Our designer, Pavithra, did an excellent job understanding our requirements and translating them into the final design. She was creative, patient with our revisions, and made sure the overall look matched what we had envisioned.

    The execution was handled smoothly, with good coordination throughout the project. We are very happy with the final outcome, quality of work, and finishing. It was great to see the designs come to life exactly as planned.

    Overall, a very positive experience with Nits Decor, and a special appreciation to Simran and Pavithra for their support throughout the journey. Highly recommended!

Questions

Questions about turnkey fit-out.

What does turnkey fit-out include?

Design and documentation, procurement, construction and installation, and handover and aftercare — with one project manager from consultation to handover.

Who carries out the work on site?

Our own site teams, supervised daily: civil works, MEP, ceilings, flooring, joinery installation, finishing and snagging.

How is the cost set?

Through technical drawings and a full bill of quantities. You approve a design you have walked through in 3D, against a cost you have seen itemised.

How are lead times managed?

Materials, furniture, lighting, sanitary and fixtures are sourced through our supply chain, with lead times built into the programme rather than discovered against it.

What happens at handover?

A final walkthrough, quality check, documentation and warranties — then continued support once you are living or working in the space.

Do you fit out homes and businesses?
Can you fit out a bare shell as well as an existing interior?

Yes. A space can arrive as a bare shell or as an existing interior that has to be stripped out first, and the scope covers both: civil works, MEP, ceilings, flooring, joinery installation, finishing and snagging. On a renovation, a survey of what is already there comes before the price.

Who applies for the permits and NOCs?

On commercial projects we handle landlord and authority submissions, fire and life safety, accessibility and free-zone guidelines within the programme. On homes, structural changes go ahead only once engineer sign-off and the relevant approvals are in place. A developer or building NOC normally needs a request from the owner, so plan for your signature early.

How will I know how the work is progressing?

Through one project manager, who stays with the project from the first consultation to handover. Our site teams are supervised daily, and on commercial fit-outs progress is reported against the programme every week. Questions about the site go to one person who knows the whole project.

Do you fit out restaurants and shops?

Yes. Restaurants, cafés and retail spaces are fitted out under the same single contract, including mall and authority approvals, kitchen extract and services. Banquettes, back bars and display joinery are made at our factory in Al Quoz to commercial durability standards. See restaurant interior design for more.

Start here

Start a turnkey project.

A few details let us come back with something considered rather than generic. We reply to every enquiry from the design team, not a call centre.

SpaceWhat are we designing?
ConfigurationWhat is the configuration of your space?
Type of spaceWhat kind of space is it?
HandoverWhat is the property’s handover status?

Design can start before the keys arrive. It is how the best projects finish on time.

StartWhen would you like to start?
ScopeWhat would you like us to take on?
SiteWhere is the space?

Not listed? Type the name or address and press Enter.

SizeRoughly how big is it?
NotesAnything we should know?
YouWhere should our designer reach you?

With the country code, e.g. +971 50 123 4567.

Best way to reach you